Monday, February 22, 2010

Eldon in Progress

Progress is being made! All the stars have log cabins in the eights sections between the points. It wasn't hard to do, I just had to do one side at a time. Careful pressing ensures that the blocks are flat. All the connector log cabins are made, so the next step is putting the background diamonds on like the star in the top left. Watch those seam allowances!









No comments:

Post a Comment